Project:
MaggieMaeOfKS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (100)
Research
- (4)
-
Zenith Homecoming...
-
Corvair College #40
-
Bought Plans from...
-
Decided to Build an...
Workshop
- (6)
-
Moved into new shop
-
Packed Up and Moved Out
-
Moved Into Pleasant...
-
Moved Out of...
-
Moved to Lawrence
-
Workbenches
Empennage
- (1)
-
Bought Spruce Wood...
Fuselage
- (41)
-
Drilled holes for...
-
Painted Inner Cabane...
-
Bent Cabane Strut...
-
Painted Some Metal...
-
Steel Fittings
-
Finished...
-
Glove box
-
Seat Harnesses
-
Turtle Deck, Front...
-
Turtle Deck, Seat...
-
Turtle Deck
-
Trimmed Filler Strips
-
Added Filler Strips
-
Glued Gussets,...
-
Added Gussets
-
Added Gussets
-
Diagonal Braces
-
Cut One Steel Part,...
-
Steel Fittings
-
Drilled Holes in...
-
Laid Out Sheet Metal...
-
Glued Some Gussets
-
Gussets
-
Finished Seats
-
Front Seat
-
Rear Seat
-
Built Seat Bottoms
-
Trimmed Floor,...
-
Began Forming Tail...
-
Glued First Cross...
-
Set Up Fuselage Trusses
-
Added Gussets to...
-
Added Wedges, Made...
-
Dismantled Truss Jig
-
Second Fuselage Truss
-
Second Truss
-
Second Side Truss
-
Glued First Truss
-
Built Fuselage Jig
-
Cut Struts and Braces
-
Bought Wood for...
Firewall
Tail Feathers
Wings
- (1)
-
Metal fittings
Controls
- (2)
-
Welding
-
Cut control horns
Avionics
- (1)
-
Intercom
Lighting
Instrument Panel
Landing Gear
Engine
- (13)
-
Bought Spruce Wood...
-
Bought Distributor,...
-
Bought Engine Mount
-
Received Another...
-
Continued Cleaning...
-
Continued Cleaning...
-
Continued Cleaning...
-
Began Cleaning...
-
Continued Core...
-
Continued Core...
-
Continued Core...
-
Began Core Engine...
-
Bought First Core...
Propeller
Fuel System
- (29)
-
Painted Fuel Tank
-
Primed Fuel tank
-
Tested Fuel Tank...
-
Attached Fuel...
-
Sealed Rivets
-
Fuel Quantity Probe
-
Bondo On Outside of...
-
Assembled Fuel Tank
-
Vent Tubes, Probe...
-
Fuel Probe Mount
-
Made Gussets for...
-
Riveted Top of Tank
-
Steel Fittings, and...
-
Continued Fuel Tank
-
Fuel Tank
-
Started Top of Fuel...
-
Built Drain and...
-
Attached Flange...
-
Turned Tubes And...
-
Match Drilled Bottom...
-
Marked Rivet Hole...
-
Continued Fuel Tank
-
Continued Fuel Tank
-
Began Fuel Tank...
-
More Fuel Tank Parts...
-
More Parts Purchased
-
More Fuel Tank Parts
-
Fuel Tank Design
-
Fuel Tank Parts
Interior Finish
Paint / Decals
- (1)
-
Fuselage Side Art
Inspection
- (1)
-
Girls Checked Out...
Tools
Builder Name:
Bryce Gorrell
-
Project:
Pietenpol - Aircamper
-
VIEW REPORTS
Total Hours:
394.2
Total Flight Time:
Total Expense:
$7932.61
Start/Last Date:
Feb 01, 2017 - No Finish Date
Engine:
Bryce Gorrell, CorvAIR
Propeller:
Warp Drive
Friendly URL:
https://eaabuilderslog.org?s=MaggieMaeOfKS
Home or Last Project Picture
Feb 18, 2017
Began Cleaning Engine Parts
- (3 hours)
Category: Engine
Lightly washed crank, cam and case halves.